18+污漫画,亚洲国产港台日韩欧美三级电影网,办公室扒开奶罩揉吮奶明星,爱爱电影爱情影院网,斗破苍穹 小说免费阅读全集,人妻洗澡被强伦姧完整,打扑克牌又疼又叫视频软件,亚洲,日韩,aⅴ在线欧美,寂寞少妇扒开双腿猛烈进入免费看

中文|English|Fran?ais|Русский язык| 日本語(yǔ)|Espa?ol|????|Deutsch| ???|Português|Türk?e|Bahasa Indonesia| ?аза? т?л?|Ti?ng Vi?t|lingua italiana
Home > Nuclear Industry

Hualong One (HPR1000) Demonstration Project

Updated:2021-12-26 | By:The Academy of Contemporary China and World Studies

Hualong One (HPR1000) Demonstration Project 

Hualong One (HPR1000) is a 1,000 MWe-class advanced pressurized water reactor jointly developed by China National Nuclear Corporation (CNNC) and China General Nuclear Power Corporation (CGN). It is mainly characterized by a 177-fuel-assembly core, resistance to aircraft impact, multiple redundant safety systems and combination of active and passive safety measures. Its safety performance and technical indicators have met the international standards on Gen III nuclear power technology. As part of the demonstration project, the construction of units 5 and 6 at Fuqing in Fujian Province started on May 7, 2015; and the construction of units 3 and 4 at Fangchenggang (Phase II) in Guangxi Zhuang Autonomous Region kicked off on December 25, 2015. On January 30, 2021, Fuqing Unit 5, the first of its kind in the world, was put into commercial operation. With a construction period of 68.8 months, it recorded the shortest construction time for the first reactor of Gen III nuclear power plants in the world. 

福清核電站5、6號(hào)機(jī)組
Units 5 & 6 of Fuqing NPP

華龍一號(hào)示范工程

華龍一號(hào)是中國(guó)兩大核電企業(yè)中國(guó)核工業(yè)集團(tuán)公司和中國(guó)廣核集團(tuán)公司自主研發(fā)的百萬(wàn)千瓦級(jí)先進(jìn)壓水堆核電技術(shù)。華龍一號(hào)以 177組燃料組件堆芯、抗大飛機(jī)撞擊、多重冗余的安全系統(tǒng)、能動(dòng)與非能動(dòng)相結(jié)合的安全措施為主要技術(shù)特征,安全性能和技術(shù)指標(biāo)滿足國(guó)際三代核電技術(shù)標(biāo)準(zhǔn)。作為華龍一號(hào)示范工程, 2015年 5月 7日,福建福清核電站 5、6號(hào)機(jī)組正式開工建設(shè); 2015年 12月 25日,廣西防城港核電二期 3、4號(hào)機(jī)組正式開工建設(shè)。 2021年 1月 30日,華龍一號(hào)全球首堆——福清核電站 5號(hào)機(jī)組投入商業(yè)運(yùn)行,并以 68.8個(gè)月的建設(shè)工期,創(chuàng)造全球三代核電首堆建設(shè)最短工期紀(jì)錄。

Buzzwords
Contact Us